We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 diverse branches. For more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Separated tower concrete inserting boom with hydraulic jack up lifting system
Tower Column hydraulic jack-up concrete positioning growth, Self-climbing variety, climbing by floor frame or by shaft frame. Largely utilized for concrete inserting of construction task, such as civil development, plant construction, bridge construction, beam property, nuclear electrical power plant, infrastructure, and so forth.
Charactics
Modular design, mechanical and electrical integration handle, folding growth, tube column, flooring body and shaft body. Integration of sophisticated characteristics and merchandise diversification, to accomplish a increased solution portfolio, improve the applicability of the solution.
Imported hydraulic and electrical parts, undertake high quality fa EPT coupling for hydraulic pipelines, which is transformed rapidly, it can effectively fix the difficulty of oil leakage in the method of assembling and dismantling, and steer clear of the pollution of the surroundings. Safety and dependability
sections R sort hydraulic boom, large circular arc, novel and beautiful physical appearance, compact framework, and the light-weight style of the growth, which lowered the fat of the total equipment..
Easy to transportation and install.
Outfitted with self-climbing frames which are driven by hydraulic and which climb up automatically from the existing floor to the desired floor along the holes to begin with prepared in elevator nicely, the positioning booms increase with the rising flooring, preserving time and labor.
Functions
A.Growth
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT system
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Interior EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wi-fi Distant Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electrical Control Technique
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Choice:
u Inner-climbing frames: Flooring frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Equipment slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio distant Management: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Placing increase Specs:
Model | Models | HGY29C | ||
Performance | Max.radius of positioning increase | m | 28.9 | |
Freestanding peak (to the joint in between the stop of the increase and swivel desk) | m | 22.7 | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total excess weight | kg | 19100 | ||
Counter bodyweight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | eleven | ||
EPT method |
Pressure | MPa | thirty | |
Flux | l/min | eighteen | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control method |
/ | Quick-haul Manage /radio remote control | ||
Pipeline cleansing | / | Moist cleansing/Dry cleaning |
||
Structure of tower physique | / | Tubular column | ||
Section of tower physique | m×m | .75×0.seventy five | ||
Boom |
Shape | / | Three hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT part | Length | m | eleven.5 | |
Articulation | ° | 0°~82.5° | ||
2nd area | Size | m | 9.three | |
Articulation | ° | 0°~180° | ||
3rd area | Length | m | 8.one | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing mode | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .52 | ||
Floor frame | / | Hole ready in flooring |
||
Shaft body | m | Gap ready in floor 2.~2.7 |
||
Min.Interval of climbing body | Climbing | m | three. | |
Inserting concrete | m | six. | ||
Rest | m | 6.0 |
29m Putting BoomWorking Range :
33m Tower Jack-up Concrete Placing growth Requirements:
Model | Models | HGY33E | ||
Performance | Max.radius of inserting boom | m | 33 | |
Freestanding top (to the joint amongst the end of the boom and swivel table) | m | 22.seven | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | constantly near | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total bodyweight | kg | 21200 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-4 | |
Power | kW | fifteen | ||
EPT method |
Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control method | / | Brief-haul Manage /radio distant manage | ||
Pipeline cleansing | / | Damp cleansing/Dry cleaning |
||
Structure of tower entire body | / | Tubular column | ||
Section of tower physique | m×m | .75×0.75 | ||
Boom |
Shape | / | Three hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT section |
Length | m | 12.38 | |
Articulation | ° | 0°~82.5° | ||
2nd area | Length | m | 10.93 | |
Articulation | ° | 0°~180° | ||
3rd segment |
Length | m | 9.69 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .52 | ||
Floor body | / | Hole prepared in flooring | ||
Shaft body | m | Hole geared up in flooring 2.~2.7 |
||
Min.Interval of climbing frame | Climbing | m | 3. | |
Positioning concrete | m | six. | ||
Rest | m | 6.0 |
33m Positioning BoomWorking Range :
Tower Column Concrete Positioning Growth Installation:
Tower Inserting Growth Task website Overall performance:
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 different branches. For much more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of first tools manufacturer’s (OEM) component numbers or logos , e.g. CASE® and John Deere® are for reference functions only and for indicating solution use and compatibility. Our company and the outlined substitution areas contained herein are not sponsored, accredited, or made by the OEM.