We – EPG Team the greatest gearbox & motors , torque limiter couplings and gears manufacturing unit in China with 5 different branches. For a lot more particulars: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Cosmetics Box Very hot Foil Stamping Embossing Equipment
Movie: be/tnhthehN8mc
Features:
The MHK-1050T/TC entirely automated very hot stamping and die cutting machine can effectively complete the die chopping and stamping of products, as properly as preserving the greatest precision and product good quality. The MHK-1050T/TC complete-computerized scorching stamping device are well equipped and almost can adapt to all sizzling stamping requirements of items.
one. High top quality feeder created in ZheJiang with 4 suction nozzle for stack paper and 4 suction nozzle for delivering paper , guarantees stable and quick paper feeding .
2. Pre-loading device , non-cease feeding , with Max pile top to 1600mm.
three. The pre-loading device is outfitted with guiding rails , operator transfer the stack paper to feeder correctly and conveniently .
4. Side and front guiding have sensor which can alter the sensitivity.
5. The anti-obstacle unit stop the equipment destroyed.
6. Paper feeding will be slow down when the paper get to the front guiding , attain much more precise location .
seven. Japanese NITA convey belt , the speed can be modified .
eight. Germany created stainless metal is used for express board in order to accomplish sleek and rapid paper shipping .
9. Pneumatic cutting plate carry for easy slide in and out .
10.Easy way to flip above and alter die cutting chase and plate with quick time .
eleven.Large quality gripper bars made in Japan with lengthy life time .
12.Large high quality U.K imported chain guarantee steadiness and accuracy in prolonged time operating .
13.Automated lubrication and cooling method for principal push and automatic lubrication for main chain .
fourteen.Overload safety system with torque limiter in index box for the highest safety of operator and gear .
15.Crank shafts and worm rod is made of 40 Cr with heating managing . Turbine iCritical generate factors can fail or fracture from just a solitary moment or action. This incidence, known as mechanical overload, is when a rotating component activities torques over and above what the technique is developed to handle. Any rotating operation can develop a good deal of torque and, if there is any variety of malfunction, all of that drive can break impacted components including, but not limited to, the couplings, the travel or motor shafts, and/or the gearing.s created of copper .
sixteen.Substantial quality imported air clutch .
17.SMC pneumatic factors .
eighteen.The higher , middle and lower stripping frames are managed by 3 GPRS of cam wheels respectively.
19.Match with the center-line registration technique in die reducing unit , the exact same program also use to the stripping station to lessen changeover time , Correct positioning can boost creation performance.
Much more Information:
Complex Parameter:
Model | MHK-1050T/TC |
Max Sheet dimension | 1050*750 mm |
Min Sheet dimension | 400*360 mm |
Max Die cut size | 1040*720 mm |
Max Scorching stamping size | 1040*720mm |
Inner chase dimension | 1080*745mm |
Paper thickness | eighty-600g/m2 corrugated considerably less than 4mm |
Precision | less than .1mm |
Max. force | 300T |
Max die reduce speed | 7500s/h |
Max feeder pile peak | 1600mm(contain pallet) |
Max assortment pile peak | 1400mm(incorporate pallet) |
Max foil diameter | 250mm(vertical) 200mm(horizontal) |
Foil width | twenty-1571 mm |
Major motor | 11Kw |
Overall dimension | 7700*5200*2600mm |
Device fat | 18.5 Tons |
Total electrical power | fifty two Kw |
Our Plant Check out:
Pac ept And Shipping and delivery:
Clients And Exhibition:
FAQ
1. Q: What is your shipping and delivery term?
A: FOB,CIF,CFR usually.
2.Q: What is your payment?
A: T/T.30% deposit, 70% harmony just before shipping.
L/C. a hundred% at sight.
T/T and L/C, 30% TT deposit, 70% L/C.
three.Q: What is your shipping and delivery time?
A: 30-fifty days generally
four.Q: What is your guarantee and other conditions?
A: A single 12 months equipment warranty,and entire daily life technological assist. Spare components are free of charge for buyer in 1 year.
We can send out our engineer to your manufacturing unit for machine set up and operator trainning if you need,
Customer pay out the flight tickets,foods and hotel for our engineer.
Salary USD100.00 per day to our engineer.
The use of authentic products manufacturer’s (OEM) element figures or logos , e.g. CASE® and John Deere® are for reference reasons only and for indicating item use and compatibility. Our company and the outlined substitution elements contained herein are not sponsored, authorized, or produced by the OEM.